Wouldn't it be February first as the default in excel?
Edit: I tested this with excel. I typed “1/2” and it automatically converted it to “02-Jan”
Yes, 1 February It would have been for most.
Now it's just an north american joke
I just tested, entering “1/2” into excel results in “02-Jan”
Truly cursed.
1/2 = 0.5
Excel counts dates 1 from 01/01/1900. Entering 0.5 and formatting as date and time gives: 00/01/1900 12:00:00 because of course it does.
Of course is does. the Unix epoch isn't "invented" by us so can't go with that
Me: the glass is half empty and the other half sucks!
I'm "fun" at parties. lol
Pissimist: the glass is full... Of piss.
Whenever I need to use excel, I just grab paper, a pencil and a ruler instead
This always assumes that whatever's in the glass is desirable. If it's partially filled with piss, the optimist and pessimist roles would be reversed. Although Excel would remain the game.
LibreOffice: Jan 1, one half, one third
Could be worse - outside of the US, the glass is generally February 1st
The glass is at 50% capacity.