HS2 is officially ‘unachievable’ after being given red rating
HS2 is officially ‘unachievable’ after being given red rating
Problems with first two phases, from London to Birmingham and then to Crewe, ‘do not appear to be resolvable’
You're viewing a single thread.
@Noit Britain isn't able to do high-speed rail?
3 0 ReplyBritain struggles to achieve any project of scale. Just look at our lack of success in building nuclear power stations.
11 0 ReplyWe have one high speed rail link already, HS1. It goes from London to the channel tunnel.
This article is about HS2, that would go north.
2 0 Reply@vext01 Perhaps what I mean is that the British are *now* unable to build projects of scale
1 0 ReplyMaybe not with all the other stuff going on...
1 0 Reply
If you think that's bad, wait till you hear about the US... Only one small part that hits 150mph (240km/h) on a 50mi (80km) section. For a country that's got more land area that Europe....
2 0 Reply